TUESDAY, FEBRUARY 10, 2015 / MARDI LE 10 FEVRIER, 2015

4359

Dispute between CNR and TCRC-CTY-W concerning the Company’s new policy statement that any grievance withdrawal by the Union is done on a ‘with prejudice basis’. (COUNSEL)

4360

Dispute between CPR and USW-Local-1976 concerning M. McManuss and the violation of Article 23.7 (3) when she was placed on a permanent position with the refusal of the Company to accommodate her medical restrictions.

4361

Dispute between CPR and TCRC-MWED concerning the discharge of S. Campbell for the failure to ensure the proper Sub-Foreman protection was in place and the failure to ensure the safety of employees under his charge while employed as an EGF on the Manitoba Distribution Crew. (COUNSEL)


WEDNESDAY, FEBRUARY 11, 2015/ MERCREDI LE 11 FEVRIER, 2015

4362

Dispute between CPR and TCRC-CTY-E concerning the thirty-day suspension of Conductor F. Commisso for his failure to ensure a prompt and accurate tie up from duty resulting in an inaccurate and inappropriate 10 hour violation and subsequent $80.00 NG claim. (COUNSEL)

4363

Dispute between CPR and TCRC-LE-E concerning the thirty-day suspension of Locomotive Engineer V. Maggio for failure to ensure a prompt and accurate tie up from duty resulting in an inaccurate and inappropriate 10 hour violation and subsequent $80.00 NG claim. (COUNSEL)

4364

Dispute between CPR and TCRC-CTY-E concerning the discharge of Conductor G. Dickson for the violation of CROR Rule G, CROR General Notice and Alcohol and Drug Policy 4100/5100 as a result of the refusal to submit to a post incident test while working as a trainperson on assignment U55-11. (COUNSEL)

4365

Dispute between CPR and TCRC-LE-W concerning the discharge of Locomotive Engineer R.S. for the positive results of the post incident substance test conducted following the discovery of his crew operating train 462-04 between Glenlily and Yahk without correct train documents. (COUNSEL)


THURSDAY, FEBRUARY 12, 2015 / JEUDI LE 12 FEVRIER, 2015

4366

Dispute between CPR and TCRC-LE-W concerning the discharge of J. D’Arcey for failing to inspect a passing train, in violation of CROR Rule 110, during his tour of duty on train 100-08. (COUNSEL)

4367

Dispute between CPR and TCRC-CTY-W concerning the discharge of Conductor S. Jawanda for providing false and misleading information with regards to the alleged injury sustained on October 31, 2013. (COUNSEL)

4368

Dispute between CPR and TCRC-CTY-W concerning the discharge of Conductor S. Shymko for his misrepresentation with respect to his physical abilities and restrictions affecting the performance of his duties, resulting in the receipt of benefit payments to which he was not entitled. (COUNSEL)

4369

Dispute between CPR and TCRC-CTY-W concerning Conductor D. Hatley and the following:

·   Assessment of 30 demerits on March 12, 2013 for failing to fulfill contractual obligation to CPR as evidenced by repeated absences from active service by booking sick  and missing three calls during the period of February 12, 2012 to February 12, 2013.

·   Assessment of 20 demerits on May 30, 2013 for failure to inspect train 100-07 while waiting in the siding at Herbert, SK on the Swift Current Subdivision while on train 853-007 on April 9, 2013 and failure to comply with Information Bulletin S-166-12 Incorrect of No-Delay Reporting within CMA.

·   Assessment of 30 demerits September 9, 2013 for failing to ensure the movement had proper authority to enter the main track on two occasions at Belle Plaine on the Indian Head Sub with train K-33-28.

·   Discharge for accumulation of demerits. (COUNSEL)


TUESDAY, FEBRUARY 16, 2015/ MARDI LE 16 FEVRIER, 2015

4371

Litige entre CNR et TCRC-LE-E concernant l’annulation par la Compagnie des affectations de C. Robillard et S. Lavoie sur la liste de relève.

 

4372

Litige entre CNR et M.U.A.-Local 2004 concernant M. Boehmé, a été mis hors service par la compagnie. Le 7 mai 2014 la compagnie décida de congédier M. Boehmé pour avoir réclamé et avoir payé des dépenses de kilométrage et indemnités globales auxquelles il n’avait pas droits entre le 1er novembre 2013 et le 10 avril 2014.

 

4373

Litige entre CMQR et M.U.A.-Local 1976 concernant la suspension et le congédiement imposé par l’employeur en date du 18 décembre 2013 a monsieur K. Demers. 

 

4374

Litige entre CMQR et M.U.A.-Local 1976 concernant la suspension et le congédiement imposé par l’employeur en date du 3 décembre 2013 a monsieur P. Veilleux.